Bite Turbos [Instructional Video] How to place composite bite turbos using reusable jigs: etch, bond, fill the jig and cure.
PowerTube [Instructional Video] Tying 0.030 power tube from a traction hook to the archwire with a surgeon's knot.
Open Coil Spring [Instructional Video] Measuring and placing an open coil spring, ligating the adjacent teeth, then activating it.
Ligation [Instructional Video] Placing and removing elastic ties, figure-eight ties and steel ligatures.
LaceBack’s [Instructional Video] Placing and tightening 0.010 steel lacebacks to retract canines after premolar extraction.
Cinchback’s [Instructional Video] Cinching back an archwire: trim to 2–3 mm, anneal the end in the flame, and bend it tight to the tube.